The Jurnal Rekayasa Sipil dan Lingkungan (JRSL) is a national peer-reviewed and open-access journal. Published research papers covering all aspects of civil engineering, including Structural Engineering, Transportation Engineering and Management, Construction Management, Hydraulics Engineering, Geotechnical Engineering, and Environmental Engineering. JRSL publishes two numbers in one volume every year, and the first time is published in January 2017 (Vol 1 No 1).
PUBLISHED: 2021-02-26
Table of Content
Vol. 4 No. 2 (2020): Jurnal Rekayasa Sipil dan Lingkungan
Soil Improvement using Combination Preloading and Prefabricated Vertical Drain Method at Pematang Panggang – Kayu Agung Toll Road Contruction, South Sumatera
107-112
Penerapan Metode Building Information Modeling (BIM) Pada Pembangunan Gedung Integrated Laboratory for Natural Science and Food Technology Universitas Jember
Application of The Building Information Modeling (BIM) Method for the IsDB Integrated Laboratory for Natural Science and Food Technology Universitas Jember
113-119
Penilaian Kriteria Green Building Gedung Auditorium Universitas Jember Tahap Design Recognition Menggunakan Standar Penilaian Greenship Versi 1.2
Assessment Criteria of Green Building for Auditorium Building in Jember University Design Recognition Step Using the Assessment Standart Greenship Version 1.2
120-129
Penilaian Kondisi Manajemen Aset Bangunan Gedung Menggunakan Metode Indeks Pada Komponen Arsitektural dan Struktural
Assessment of Building Asset Management Conditions Using Index Methods in Architectural adn Structural Components
130-140
Assesmen Elemen Green Building Gedung IsDB Integrated Health Science Universitas Jember Menurut Standar Greenship Versi 1.2
Assessment of Green Building Element in IsDB Integrated Health Science Building University of Jember Based on Standard Greenship version 1.2
141-152
Evaluasi Sistem Penyediaan Air Minum di Kecamatan Rasanae Timur Kota Bima
Evaluation Water Supply System of Rasanae Timur District In Bima City
153-163
Kajian Pengembangan Pelabuhan Pangkal Balam Berdasarkan Demand Pull dan Supply Push
Pangkal Balam Port Development Study Based on Demand Pull and Supply Push
171-183
Analisis Kinerja Trotoar dan Fasilitas Penyeberangan Orang di Perkotaan (Studi Kasus Area Pusat Kegiatan Kota Bandar Lampung)
Performance Analysis of Sidewalks and Pedestrian Facilities in Urban Areas (Case Study of the Activity Center Area of the City of Bandar Lampung)
184-192